Infrastructure
OneHub Chennai offers future ready infrastructure for hassle-free operations. The infrastructure was developed by taking into consideration the future requirements and geographical information of past 50 years.
Future Ready Infrastructure
The infrastructure facilities at OneHub Chennai are designed and built basis an extensive study of past geographical data as well as future requirements of the industries. All industrial plots are connected to road network, water supply pipelines, storm water pipelines and sewerage collection network. The infrastructure facilities at OneHub Chennai, except the electricity lines, are all developed underground.
The international experience and expertise of CapitaLand in developing world-class Industrial Parks helped OneHub Chennai to build one of the finest Industrial Parks.

Future Ready Infrastructure
The infrastructure facilities at OneHub Chennai are designed and built basis an extensive study of past geographical data as well as future requirements of the industries. All industrial plots are connected to road network, water supply pipelines, storm water pipelines and sewerage collection network. The infrastructure facilities at OneHub Chennai, except the electricity lines, are all developed underground.
The international experience and expertise of CapitaLand in developing world-class Industrial Parks helped OneHub Chennai to build one of the finest Industrial Parks.
Electricity
- 188 MVA of total sanctioned electricity
- Two power substations with configurations of 230 KV and 110 KV are built within the campus
- The substations are connected to State Electricity Grid, providing most reliable electricity
- Backup diesel generators for common areas

Electricity
- 188 MVA of total sanctioned electricity
- Two power substations with configurations of 230 KV and 110 KV are built within the campus
- The substations are connected to State Electricity Grid, providing most reliable electricity
- Backup diesel generators for common areas
Water
- 23 MLD of sanctioned water by Govt. of Tamil Nadu
- 7.6 ML of water storage tanks
- Metered water supply through underground water pipeline network

Water
- 23 MLD of sanctioned water by Govt. of Tamil Nadu
- 7.6 ML of water storage tanks
- Metered water supply through underground water pipeline network
Roads
- Well-developed road network for easy movement of vehicles
- Spine Road: 46 meters wide i.e., 6 lane road
- Secondary Roads: Roads with width ranging from 36 meters to 24 meters

Roads
- Well-developed road network for easy movement of vehicles
- Spine Road: 46 meters wide i.e., 6 lane road
- Secondary Roads: Roads with width ranging from 36 meters to 24 meters
Sewerage Treatment
- Complete sewerage water management from collection of sewerage water to treatment and disposal
Drainage Network
- Rainwater drain network throughout the industrial park
- The drain network is connected to water canals that flush out water from the area

Sewerage Treatment
- Complete sewerage water management from collection of sewerage water to treatment and disposal
Drainage Network
- Rainwater drain network throughout the industrial park
- The drain network is connected to water canals that flush out water from the area
Telecommunications
- In-campus telecom tower that provides 24/7 broadband service
- Telecom ducts connected to all industrial plots
Fire Safety & Security
- 24/7 security surveillance throughout the area
- Fire hydrants placed across the area

Telecommunications
- In-campus telecom tower that provides 24/7 broadband service
- Telecom ducts connected to all industrial plots
Fire Safety & Security
- 24/7 security surveillance throughout the area
- Fire hydrants placed across the area